No Drill Metal Deck Hangers
City of Los Angeles COLA Approval Report LARR 26090
NUSIG Badger Industries Seismic Bracing Manual
List of Stocking Distributors
Thermal Modeling & Analysis
IBC, ASCE 7-05, ASCE 7-10, NFPA, OSHPD Compliant
MEP, Mechanical, Electrical, Plumbing, HVAC, Sprinkler Piping, Fire Protection
NUSIG Badger Industries Seismic Engineering
NUSIG Badger Industries Seismic Engineering
Installation of No Drill Metal Deck Hanger in Underside of Steel Composite Metal Decking
Download No Drill Metal Deck Hanger Specification Sheets
Download Badger Steel Beam Clamp Specification Sheet
Download the Installation & Spec Sheets for the No-Drill Concrete Metal Deck Hanger
Available in 3 Standard Sizes:
MDH3812 for 3/8" or 1/2" Connections
MDH1258 for 1/2" or 5/8" Connections
MDH5834 for 5/8" or 3/4" Connections
Field Installation of No Drill Metal Deck Hangers Supporting Clevis Hangers for Waste and Vent Piping
Product Highlights:
  • Works on New & Existing / Occupied Buildings
  • Works for Both Vertical Gravity Support & Seismic Hangers
  • FM 1950 Cyclic Seismic Tested
  • IBC / AISI / ASCE 7 / CBC / OSHPD / NFPA-13 Compliant
  • City Of Los Angeles COLA Approval RR Report # LARR 26090
  • Installs In Less Than 1 Minute - Reduces Construction Time
  • Visual Inspection Compliant - Minimizing Inspection Cost & Time
  • Quick Installation to Verco W2 & W3 Concrete Filled Steel Decking
  • No Roto-Hammer Needed - No Noise / No Vibration / No Concrete Drilling
  • No Concrete Drilling = No Hazardous Silica Concrete Dust Containment
  • No Concrete Drilling = No Expensive HEPA Vacuum / No Expensive Drill Bits
  • No Concrete Drilling = No Hazardous Silica Dust & HEPA Filter Disposal
  • No Crop Circles = No Time Consuming Crop Circle CAD / BIM Coordination
  • No Time Consuming Placement of Inserts in Concrete Metal Decking
  • No Abandoned / Crooked / Or Damaged Cast-In-Place Inserts
  • No Abandoned Drilled Anchor Holes / No Abandoned Anchors
  • No Power Tools / HEPA Vaccums / Concrete Drill Bits / Metal Hole Saws
  • No Placement Or Drilling Conflicts With Rebar Or Other Embedments
  • No Drilled Abandoned Holes in Concrete Metal Deck
  • Removable For Future Tenant Improvements & Trade System Changes